Sinochem New Network News
Recently, PetroChina Great Wall Drilling Co., Ltd. has received 10 letters of commendation from Petromex in succession, fully affirming the company's performance in the mobilization and installation of two batches of 8 9000-meter drilling rigs in Mexico, and highly recognizing the two teams of GW168 and GW901 that took the lead in arriving in Mexico.
Since the signing of the first 3000HP drilling rig lease contract in August 2022, Great Wall Drilling has always adhered to the thinking of "playing a game of chess", coordinated resources, promoted efficiently, and established a cooperative relationship of "co-construction, win-win and sharing" with Party A. The project department achieved the signing of the contract in the same year, the drilling in the same year, and the creation of benefits in the same year, and promoted the cooperation between the two sides to enter a new stage of high-quality development.
The Great Wall Drilling Mexico Project Department has implemented "Party A can achieve itself only by achieving itself" throughout all its work, planning in advance, coordinating resources, and helping Party A achieve its exploration and development plan in 2023. Mexico's oil industry is well developed, the reservoir strata are complex, the production risk is high, and the operation standards are strict. In view of this, Great Wall Drilling selected a group of on-site personnel with rich experience in Latin America, set up an efficient operation support team that understands Spanish and production, and built a multi-level three-dimensional communication channel with Party A for mutual sharing of resources and information, so as to complete the integration of cultural exchange, mutual benefit of standards and mutual trust of personnel of "new country, new equipment and new team" in a short period of time. As of November 30, the project department has drilled 10 holes and completed 3 holes, with a cumulative footage of 52,480 meters and a maximum depth of 8,233 meters.