China Carbon Credit Platform

Five departments including the National Development and Reform Commission: Accelerate the establishment of a product carbon footprint management system Jiangsu has become the first province with an installed offshore wind power capacity of more than 10 mi

SourceJieMian
Release Time1 years ago

Five departments, including the National Development and Reform Commission, will accelerate the establishment of a product carbon footprint management system

On November 22, the National Development and Reform Commission and other departments issued opinions on accelerating the establishment of a product carbon footprint management system. After the issuance and implementation of the "Opinions", it will be conducive to promoting industrial upgrading and helping enterprises save energy and reduce carbon emissions. The establishment of a carbon footprint management system and the establishment of a guide to reduce the carbon footprint of products will help production enterprises systematically grasp the level of energy resource consumption and carbon emissions of raw materials in each link, and then carry out targeted energy-saving and carbon-reduction transformation, improve the green level of production processes and technical equipment, and continuously reduce the carbon footprint of products.

National Energy Administration: Regulate the new modelenergy storagepower stationGridAccess management

11月22日,国家能源局就《关于促进新型energy storageGrid和调度运用的通知(征求意见稿)》公开征求意见。其中提到,规范新型energy storagepower stationGridAccess management,规范新型energy storagepower stationGridAccess management。电网企业及电力调度机构须制定新型energy storagepower stationGrid细则及Grid服务工作指引等,明确Grid流程、相关标准和涉网试验要求。

Jiangsu became the first province to have an installed offshore wind power capacity of more than 10 million kilowatts

CCTV News reported on November 22 that the reporter learned from the 2023 China-EU Offshore New Energy Development Cooperation Forum that as of the end of September this year, the cumulative installed capacity of offshore wind power in China has reached 31.89 million kilowatts. Among them, Jiangsu Province has become the first province in China to have an installed offshore wind power capacity of more than 10 million kilowatts. Jiangsu, Shandong and other provinces are planning to implement tens of millions of kilowatts of offshore photovoltaic projects.

CATL is reportedly considering listing on the Hong Kong Stock Exchange

Reuters-affiliated International Financial Review (IFR) reported on November 22 that CATL is considering listing in Hong Kong, according to people familiar with the matter. The company has already held internal and external discussions with financial advisers about a potential listing, which could lead to a Hong Kong listing as early as next year, with CSC, CICC, Goldman Sachs and UBS expected to lead the deal.

GCL Integration's 4.842 billion yuan fixed increase was approved by the Shenzhen Stock Exchange

GCL Integration announced on November 22 that the Shenzhen Stock Exchange's issuance and listing review agency reviewed the company's application documents for issuing shares to specific targets, and believed that the company met the issuance conditions, listing conditions and information disclosure requirements. According to the prospectus, GCL SI intends to issue no more than 1.755 billion shares of the company to no more than 35 specific investors, raising no more than 4.842 billion yuan for the Wuhu GCL 20 GW high-efficiency cell project and replenishing working capital.

ConcordNew energyRepurchase of 300,000 shares

ConcordNew energy(00182.HK)11月22日公告称,公司于今日在香港交易所回购30万股,耗资19.8万港元。ConcordNew energy近三个月累计回购股份数为2.32亿股,占公司已发行股本的2.69%。

Jiangxi Changyun plans to invest in the establishmentSmart energyTechnology companies

江西长运(600561.SH)11月22日公告,公司拟与国家电投集团江西电力有限公司、江西南昌公共交通运输集团有限责任公司、江西南昌旅游集团有限公司共同出资设立南昌绿动交投Smart energy科技有限公司。此次投资有利于公司New energy业务布局,加快公司所属企业屋顶、场站空闲场地photovoltaicproject开发与合作。

Hangzhou Colin投资4亿元建设energy storageand newphotovoltaicproject

Hangzhou Colin(688611.SH)11月21日晚间公告,拟与杭州钱塘新区管理委员会签订《柯林电气energy storageand newphotovoltaicproject投资协议书》,通过公司全资子公司Hangzhou ColinNew energy有限公司和控股子公司杭州柯能New energy有限公司在杭州市钱塘区投资建设energy storageand newphotovoltaicproject,project总投资为4亿元。

RegionJiangsu,Jiangxi,Shandong,Hongkong SAR
Like(0)
Collect(0)